Project Highlights

Every square inch of the inside is welded up if that is what it takes
Sometimes it takes a lot of weld... 400# of wire is unusual, but not unheard of
Cracks and washouts are excavated to the bottom and welded 100%
We chase and "wobble test" each stud hole to determine if the threads are good
Stud holes are drilled out and welded up, as many as are required
Each part is stress relieved after welding. We hold 'em 7 hours at 1250 degrees
Most of the machining is done on late model CNC equipment